Quick answers
What is this project?
Forest Diversion for Upgradation of Narmadapuram-Timarni Road From two Lane with Paved Shoulder Configuration of Existing Ch.(0+000 km to 72+180 Km.) Under Narmadapuram Forest Division of Narmadapuram District in the State of Madhya Pradesh is a proposed road project in Chhidgaon, Timarni, Harda, Madhya Pradesh. It seeks 1.1 acres of forest land.
Who is building it?
The applicant is Mprdc Narmadapuram.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Chhidgaon, Timarni, Harda, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1.4 crore and 1.1 acres (0.4 ha) of forest land.
When was it filed?
The application was filed on 20 Nov 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 7 Sept 2026 |
| Application filed | 20 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Mprdc Narmadapuram |
| Forest land | 1.1 acres (0.4 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Chhidgaon |
| Taluk / tehsil | Timarni |
| District | Harda |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09825 |
In context
22 applications in Harda since January 2022 are in the same category (Roads & highways): 5 approved, 1 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval.
Where it is
Chhidgaon, Timarni, Harda, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chhidgaon Mel Sand Quarry (4.00 Ha.) — more information requested, 27 km away
- No Increase in Pollution load for proposed expansion of M/s SMS Biofuel… — initial checks, 29.3 km away
- Bothi to Mahukhal — lapsed, 39.9 km away
- 11 KV Balagaon Interconnection work , Rehatgaon DC — lapsed, 40.1 km away
- Chhipaner Sand Mine — lapsed, 40.4 km away
- Chhipaner Sand Mine — cleared for impact study, 40.4 km away
- Mahukhal to Kayri — lapsed, 41.2 km away
- Pachora Sand Mine — lapsed, 41.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.