Quick answers
What is this project?
Expansion Project for Ferro plant at Industrial Area Sarandi, Waraseoni of M/s Ramnik Power and Alloys Pvt. Ltd is a lapsed power project in Murjhad, Waraseoni, Balaghat, Madhya Pradesh. The site covers 1 acre.
Who is building it?
The applicant is Mpptcl Jabalpur.
Has it been approved?
No. The application was lapsed on 5 Feb 2024, so it is no longer under consideration.
Where is it?
In Murjhad, Waraseoni, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹15.7 crore; a site of 1 acre and 3,900 m² of forest land.
When was it filed?
The application was filed on 23 May 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 5 Feb 2024 |
| Application filed | 23 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Mpptcl Jabalpur |
| Land area | 3,900 m² |
| Forest land | 3,900 m² |
| Project cost | ₹15.7 crore |
| Village / locality | Murjhad |
| Taluk / tehsil | Waraseoni |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09839 |
In context
45 applications in Balaghat since January 2022 are in the same category (Power): 1 approved, 18 filed or under review, and 26 withdrawn, lapsed or rejected. At 1 acre, this one is smaller than 100% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Murjhad, Waraseoni, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chandori Sand Quarry — environmental approval granted, 1.1 km away
- Sarandi Sand Quarry — lapsed, 1.3 km away
- Sarandi Sand Quarry — cleared for impact study, 1.3 km away
- Sawangi Sand Quarry — environmental approval granted, 2.1 km away
- Sawangi Sand Quarry — cleared for impact study, 2.1 km away
- Sawangi Sand Quarry — under environmental review, 2.1 km away
- Khapa Sand Quarry — under environmental review, 3.4 km away
- Capacity Expansion of Grain Based Fuel Ethanol Unit from 195 KLD to 345 KLD — lapsed, 3.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.