Quick answers
What is Rihand Micro Lift Irrigation Scheme?
Rihand Micro Lift Irrigation Scheme is a lapsed water and irrigation project in Suidih, Singrauli, Madhya Pradesh. It seeks 2.2 acres of forest land.
Who is building it?
The applicant is Eewrd Singrauli.
Has it been approved?
No. The application was lapsed on 11 Aug 2024, so it is no longer under consideration.
Where is it?
In Suidih, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹672.3 crore and 2.2 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 26 Aug 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 11 Aug 2024 |
| Application filed | 26 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Eewrd Singrauli |
| Forest land | 2.2 acres (0.9 ha) |
| Project cost | ₹672.3 crore |
| Village / locality | Suidih |
| Taluk / tehsil | Singrauli |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09896 |
In context
11 applications in Singrauli since January 2022 are in the same category (Water & irrigation): 5 approved, 0 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Suidih, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amilwan Sand Quarry — environmental approval granted, 4.6 km away
- Amelia Coal Mine Project — environmental approval granted, 5.7 km away
- Amelia Coal Mine Project — environmental approval granted, 5.7 km away
- Singrawal Metal Stone Quarry — lapsed, 5.8 km away
- Harraiya Soil Quarry — environmental approval granted, 5.8 km away
- Harraiya Soil Quarry — lapsed, 5.8 km away
- 33 KV Double Circuit Line from 132/33 KV Substation Rajmilan to village… — forest land use approved, 6.8 km away
- Expansion of production from 2.80 to 3.92 MTPA of Amelia (North) Coal Mine — environmental approval granted, 7.8 km away
More from Eewrd Singrauli in Singrauli
- Rihand Micro Lift Irrigation Scheme — lapsed
- Rihand Micro Lift Irrigation Scheme — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.