What is Developing? Open the mapMap

LapsedRoads & highways · Chhindwara, Madhya Pradesh

Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal road authority Kohpani-Salaiya Bulaki route DFO East Chhindwara

Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal road authority Kohpani-Salaiya Bulaki route DFO East Chhindwara is a lapsed road project in Aherwara, Harrai, Chhindwara, Madhya Pradesh. The site covers 2.1 acres. Its stated project cost is ₹20 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 15 Sept 2023).

See it on the live map All projects in Chhindwara

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since15 Sept 2023
Application filed30 Mar 2023
Approval soughtForest land use
Application typeChange of use
SectorRoads & highways
ApplicantJio Digital Fibre Private LTD
Land area2.1 acres (0.8 ha)
Project cost₹20 lakh
Village / localityAherwara
Taluk / tehsilHarrai
DistrictChhindwara
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-09918

In context

40 applications in Chhindwara since January 2022 are in the same category (Roads & highways): 4 approved, 23 filed or under review, and 13 withdrawn, lapsed or rejected. At 2.1 acres, this one is smaller than 78% of them.

Where it is

Aherwara, Harrai, Chhindwara, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jio Digital Fibre Private LTD in Chhindwara

17 Jio Digital Fibre projects in Chhindwara
All 787 Jio Digital Fibre projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.