Quick answers
What is this project?
Work of Augmentation of Water Supply System of Bargawan town under AMRUT 2.0 is a lapsed water and irrigation project in Odagadi, Deosar, Singrauli, Madhya Pradesh. The site covers 3,690.2 acres.
Who is building it?
The applicant is Nagar Parishad Bargawan.
Has it been approved?
No. The application was lapsed on 15 Apr 2026, so it is no longer under consideration.
Where is it?
In Odagadi, Deosar, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹26.3 crore; a site of 3,690.2 acres and 1,300 m² of forest land.
When was it filed?
The application was filed on 23 Dec 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 15 Apr 2026 |
| Application filed | 23 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Nagar Parishad Bargawan |
| Land area | 3,690.2 acres (1,493.4 ha) |
| Forest land | 1,300 m² |
| Project cost | ₹26.3 crore |
| Village / locality | Odagadi |
| Taluk / tehsil | Deosar |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09920 |
In context
11 applications in Singrauli since January 2022 are in the same category (Water & irrigation): 5 approved, 0 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval. At 3,690.2 acres, this one is smaller than 60% of them.
35 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Odagadi, Deosar, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Daga Muram Deposit — environmental approval granted, 2.6 km away
- Bargawan Murrum Quarry — environmental approval granted, 2.7 km away
- Daga Muram Deposit — not approved, 2.7 km away
- Bargawan Muram Quarry — initial checks, 3 km away
- Bargawan Murrum Quarry — lapsed, 3 km away
- Expansion of Aluminium Smelter from 3.98 LTPA to 7.96 LTPA and Captive Thermal… — under environmental review, 3.1 km away
- Proposed Change in Product Mix with 'No Increase in Pollution Load' for… — initial checks, 3.2 km away
- 4 Million Tons Per Annum (MTPA) Coal washery — returned to applicant, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.