Quick answers
What is Inguri-B Coal Block, Main Basin Coalfield?
Inguri-B Coal Block, Main Basin Coalfield is an approved project in P.F., Deosar, Singrauli, Madhya Pradesh. The site covers 4,932.2 acres.
Who is building it?
The applicant is Central Mine Planning and Design Institute Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 27 Aug 2026), as of 27 Nov 2026.
Where is it?
In P.F., Deosar, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹19.6 crore; a site of 4,932.2 acres and 1,158.9 acres (469 ha) of forest land.
When was it filed?
The application was filed on 16 Aug 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 27 Aug 2026 |
| Application filed | 16 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Central Mine Planning and Design Institute Limited |
| Land area | 4,932.2 acres (1,996 ha) |
| Forest land | 1,158.9 acres (469 ha) |
| Project cost | ₹19.6 crore |
| Village / locality | P.F. |
| Taluk / tehsil | Deosar |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10036 |
In context
39 applications in Singrauli since January 2022 are in the same category (Other): 17 approved, 12 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 34 days from filing to approval. At 4,932.2 acres, this one is larger than 69% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
P.F., Deosar, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tingudi SAND DEPOSIT — environmental approval granted, 3 km away
- Gond Deosar Multi Village Rural Water Supply Scheme — forest land use approved, 6.1 km away
- Talwa Sand Deposit — more information requested, 7 km away
- Gurbara North Coal Block — more information requested, 7.7 km away
- Gond Deosar Multi Village Rural Water Supply Scheme — forest land use approved, 7.8 km away
- Gond Deosar Multi Village Rural Water Supply Scheme — forest land use approved, 7.8 km away
- Pachaur Coal Block — initial checks, 8 km away
- Gondbahera Ujheni Underground Coal mine — environmental approval granted, 8.8 km away
More from Central Mine Planning and Design Institute Limited in Singrauli
- Pachaur Coal Block — initial checks
- Dongrital Coal Block — more information requested
- Gurbara North Coal Block — more information requested
- Dogrital Coal Block — forest land use approved
- Hatta- Dudhmania Coal Block, Main Basin Coalfield — forest land use approved
- Patpaharia Coal Block, Main Basin Coalfiled — forest land use approved
21 Central Mine Planning projects in Singrauli
All 58 Central Mine Planning projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.