Project details
| Status | Lapsed |
|---|---|
| Status since | 5 Jul 2026 |
| Application filed | 20 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Shyam Kumar Doley |
| Land area | 2,200 m² |
| Forest land | 950 m² |
| Project cost | ₹14 lakh |
| Village / locality | Bandar Chuha |
| Taluk / tehsil | Goharganj |
| District | Raisen |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10055 |
In context
23 applications in Raisen since January 2022 are in the same category (Water & irrigation): 5 approved, 9 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 0.5 acres, this one is smaller than 82% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bandar Chuha, Goharganj, Raisen, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Khodra Stone Quarry — lapsed, 1.8 km away
- Agariya feeder of 11kv FSP — lapsed, 2.4 km away
- Agariya Stone Quarry — environmental approval granted, 3.6 km away
- Pipaliyagoli Crusher Stone Quarry — environmental approval granted, 3.9 km away
- Pipaliyagoli Crusher Stone Quarry — cleared for impact study, 3.9 km away
- Dob Stone Quarry — lapsed, 4.2 km away
- Agariya Stone Quarry — lapsed, 4.3 km away
- Agariya Stone Quarry — lapsed, 4.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.