Quick answers
What is this project?
Proposed Forest Land for the Approach Road to the Railway Siding is a proposed road project in Bandhwa Bara, Pali, Umaria, Madhya Pradesh. The site covers 2.2 acres.
Who is building it?
The applicant is Dehmi Enterprises private limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Bandhwa Bara, Pali, Umaria, Madhya Pradesh.
How big is it?
It has a stated cost of ₹2 crore; a site of 2.2 acres and 2.2 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 25 Aug 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 12 Nov 2026 |
| Application filed | 25 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Dehmi Enterprises private limited |
| Land area | 2.2 acres (0.9 ha) |
| Forest land | 2.2 acres (0.9 ha) |
| Project cost | ₹2 crore |
| Village / locality | Bandhwa Bara |
| Taluk / tehsil | Pali |
| District | Umaria |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10067 |
In context
15 applications in Umaria since January 2022 are in the same category (Roads & highways): 4 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. At 2.2 acres, this one is smaller than 54% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bandhwa Bara, Pali, Umaria, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Marwatola VI Coal Mine (Block Area: 763.00 ha) with Coal Production Capacity:… — environmental approval granted, 2 km away
- Marwatola VI Coal Mine (Block Area: 763.00 ha) with Coal Production Capacity:… — more information requested, 2.2 km away
- Marwatola VI Coal Mine (Block Area: 763.00 ha) with Coal Production Capacity:… — cleared for impact study, 2.2 km away
- Marwatola VI Coal Mine (Block Area: 763.00 ha) with Coal Production Capacity:… — under forest review, 2.2 km away
- Marwatola VI Coal Mine (Block Area: 763.00 ha) with Coal Production Capacity:… — lapsed, 2.2 km away
- Marwatola VI Coal Mine (Block Area: 763.00 ha) with Coal Production Capacity:… — lapsed, 2.2 km away
- Marwatola VI Coal Mine — forest land use approved, 2.2 km away
- West of Shahdol (South) Coal Mine, Tehsil- Pali, District- Umaria, State-… — under environmental review, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.