Quick answers
What is this project?
220KV FCFS/DCDS TRANSMISSION LINE FOR LILO OF BOTH CIRCUIT OF JABALPUR 220KV TO NARSINGHPUR 220KV LINE AT 765KV S/s BHEDAGHAT (POWER GRID) is an approved power project in Gwari, Shahpura, Jabalpur, Madhya Pradesh. The site covers 261.5 acres.
Who is building it?
The applicant is Mpptcl Jabalpur.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 13 Feb 2026), as of 27 Nov 2026.
Where is it?
In Gwari, Shahpura, Jabalpur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹44.6 crore; a site of 261.5 acres and 6.4 acres (2.6 ha) of forest land.
When was it filed?
The application was filed on 30 Sept 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 13 Feb 2026 |
| Application filed | 30 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Mpptcl Jabalpur |
| Land area | 261.5 acres (105.8 ha) |
| Forest land | 6.4 acres (2.6 ha) |
| Project cost | ₹44.6 crore |
| Village / locality | Gwari |
| Taluk / tehsil | Shahpura |
| District | Jabalpur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10070 |
In context
6 applications in Jabalpur since January 2022 are in the same category (Power): 1 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gwari, Shahpura, Jabalpur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening & Strengthening of Meerganj to Bhedaghat Road into 4 Lane Road — under forest review, 2.9 km away
- Bagrai Dolomite Deposit — environmental approval granted, 3.4 km away
- Dharampura Sand Quarry — environmental approval granted, 3.4 km away
- Dharampura Sand Quarry — environmental approval granted, 3.5 km away
- Bagrai Dolomite and Soapstone Mine (DEIAA Case) — cleared for impact study, 3.7 km away
- 10.310ha Bagrai Dolomite Mine — environmental approval granted, 3.7 km away
- Bagrai Dolomite Mine — lapsed, 3.8 km away
- Gangai Murrum Quarry Project — environmental approval granted, 4.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.