Quick answers
What is this project?
Bharti Airtel Ltd. 5G OFC Project Katedara-Bonkatta Route DFO South balaghat is an approved telecom project in Bonkata, Tirodi, Balaghat, Madhya Pradesh. The site covers 1.7 acres.
Who is building it?
The applicant is Bharti Airtel Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 7 Oct 2026), as of 27 Nov 2026.
Where is it?
In Bonkata, Tirodi, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 1.7 acres and 1,730 m² of forest land.
When was it filed?
The application was filed on 23 Aug 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 7 Oct 2026 |
| Application filed | 23 Aug 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Land area | 1.7 acres (0.7 ha) |
| Forest land | 1,730 m² |
| Project cost | ₹60 lakh |
| Village / locality | Bonkata |
| Taluk / tehsil | Tirodi |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10137 |
In context
29 applications in Balaghat since January 2022 are in the same category (Telecom): 8 approved, 6 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.7 acres, this one is larger than 67% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bonkata, Tirodi, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- To Obtaining Environmental Clearance Is Applied for at a Throughput of… — under environmental review, 1.5 km away
- Proposed Manganese Ore Mining of M/S. Special Blasts Limited, for Recovering… — lapsed, 2.3 km away
- Mining project by Miragpur Manganese Deposit of M/s Special Blast Limited — more information requested, 2.3 km away
- Bore Hole permission for Exploration purpose — more information requested, 2.5 km away
- Hatoda Manganese Ore Mine — under environmental review, 3.1 km away
- Hatoda Manganese Ore Mine — under environmental review, 3.1 km away
- Pipartola Manganese Ore Mine — cleared for impact study, 3.4 km away
- Pipartola Manganese Ore Mine — environmental approval granted, 3.4 km away
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.