Quick answers
What is 11 KV Line Ratodana Abadi under RDSS Feeder Sepereation?
11 KV Line Ratodana Abadi under RDSS Feeder Sepereation is a lapsed power project in Dabria, Chachaura, Guna, Madhya Pradesh. The site covers 5.1 acres.
Who is building it?
The applicant is Universal Mep Projects & Engineering Services Limited.
Has it been approved?
No. The application was lapsed on 28 May 2025, so it is no longer under consideration.
Where is it?
In Dabria, Chachaura, Guna, Madhya Pradesh.
How big is it?
It has a stated cost of ₹7 lakh; a site of 5.1 acres and 3.2 acres (1.3 ha) of forest land.
When was it filed?
The application was filed on 14 Mar 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 28 May 2025 |
| Application filed | 14 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Universal Mep Projects & Engineering Services Limited |
| Land area | 5.1 acres (2.1 ha) |
| Forest land | 3.2 acres (1.3 ha) |
| Project cost | ₹7 lakh |
| Village / locality | Dabria |
| Taluk / tehsil | Chachaura |
| District | Guna |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10192 |
In context
35 applications in Guna since January 2022 are in the same category (Power): 13 approved, 5 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 13 months from filing to approval. At 5.1 acres, this one is smaller than 97% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dabria, Chachaura, Guna, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jateri Stone(Gitti & M-Sand) Quarry — environmental approval granted, 3.4 km away
- Bhainsua Stone (Gitti & M-Sand) Quarry — lapsed, 4.1 km away
- Bhainsua Crusher Stone Quarry — environmental approval granted, 4.1 km away
- Teligaon Stone Quarry — environmental approval granted, 4.2 km away
- Arnya Murrum Quarry — under environmental review, 5.8 km away
- Chopankala Sand Quarry — environmental approval granted, 7.8 km away
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed, 8.4 km away
- Jio digital Fiber Pvt. Ltd.OFC 5G Project Chachoura-Kotra route DFO Guna — lapsed, 8.4 km away
More from Universal Mep Projects & Engineering Services Limited in Guna
- 11 Kv Water Works Abadi Feeder under RDSS Feeder Saparetion Project (11KV Line) — lapsed
- 33 KV Bhodiri Feeder Electrical line (RDSS) — lapsed
- 33 Kv Kilmpur (Suator) Feeder Electric Distribution Line Under RDSS — lapsed
- 11 KV Line Jhikni (Khedikalan School) Feeder under RDSS Feeder Separation — lapsed
- 33 KV Kilampur Feeder Electric Distribution line Under RDSS Project — lapsed
- Jhiri Abadi 11 KV Feeder Line Under Feeder Separation — lapsed
16 Universal Mep Projects projects in Guna
All 32 Universal Mep Projects projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.