Quick answers
What is this project?
Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal road authority Tilsani-Niwas route DFO West Mandla is an approved telecom project in Amadadar, Niwas, Mandla, Madhya Pradesh. The site covers 4 acres.
Who is building it?
The applicant is Jio Digital Fibre Private LTD.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 28 Aug 2025), as of 27 Nov 2026.
Where is it?
In Amadadar, Niwas, Mandla, Madhya Pradesh.
How big is it?
It has a stated cost of ₹28 lakh; a site of 4 acres and 550 m² of forest land.
When was it filed?
The application was filed on 21 Aug 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 28 Aug 2025 |
| Application filed | 21 Aug 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Jio Digital Fibre Private LTD |
| Land area | 4 acres (1.6 ha) |
| Forest land | 550 m² |
| Project cost | ₹28 lakh |
| Village / locality | Amadadar |
| Taluk / tehsil | Niwas |
| District | Mandla |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10243 |
In context
27 applications in Mandla since January 2022 are in the same category (Telecom): 7 approved, 8 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4 acres, this one is larger than 90% of them.
Where it is
Amadadar, Niwas, Mandla, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chhitakhudri Medium Project additional land — lapsed, 6.9 km away
- Pipariya Stone Quarry — lapsed, 12.7 km away
- Chhitakhudari MVS under Jal Jeevan Mission — forest land use approved, 13 km away
- Chhitakhudari MVS under Jal Jeevan Mission (3.0597 Hec) — lapsed, 14.4 km away
- Common Bio Medical Waste Treatment Facility — cleared for impact study, 15.5 km away
- Kundam-banar-Tikariya OFC Laying — forest land use approved, 16.3 km away
- Chikhali Murrum Quarry — environmental approval granted, 16.6 km away
- Capacity expansion in grain base fuel ethanol unit from 100 KLD & 2.8 MW Co-… — initial checks, 17.8 km away
More from Jio Digital Fibre Private LTD in Mandla
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — more information requested
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved
6 Jio Digital Fibre projects in Mandla
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.