What is Developing? Open the mapMap

LapsedPower · Raisen, Madhya Pradesh

Work of 11 KV Ht Line in Plastic Park Tamot for Water Supply Scheme From 33/11 KV Sub Station Plastic Park to Intake Well Ratapani

Work of 11 KV Ht Line in Plastic Park Tamot for Water Supply Scheme From 33/11 KV Sub Station Plastic Park to Intake Well Ratapani is a lapsed power project in Piplani Khurd, Goharganj, Raisen, Madhya Pradesh. It seeks 4.8 acres of forest land. Its stated project cost is ₹1.3 crore. As of 27 Nov 2026, its status is “Lapsed” (since 9 Feb 2025).

See it on the live map All projects in Raisen

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleWork of 11 KV Ht Line in Plastic Park Tamot for Water Supply Scheme From 33/11 KV Sub Station Plastic Park to Intake Well Ratapani in Obedullaganj District Raisen
StatusLapsed
Status since9 Feb 2025
Application filed6 Jan 2025
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantMadhya Pradesh Plastic Park Development Corporation Limited
Forest land4.8 acres (2 ha)
Project cost₹1.3 crore
Village / localityPiplani Khurd
Taluk / tehsilGoharganj
DistrictRaisen
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-10256

In context

15 applications in Raisen since January 2022 are in the same category (Power): 1 approved, 5 filed or under review, and 9 withdrawn, lapsed or rejected.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Piplani Khurd, Goharganj, Raisen, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Madhya Pradesh Plastic Park Development Corporation Limited in Raisen

13 Madhya Pradesh Plastic Park Development Corporation projects in Raisen
All 19 Madhya Pradesh Plastic Park Development Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.