What is Developing? Open the mapMap

Forest land use approvedPower · Agar Malwa, Madhya Pradesh

33 KV Transmission Line for 181 MW Wind Solar Hybrid Project Agar Malwa

33 KV Transmission Line for 181 MW Wind Solar Hybrid Project Agar Malwa is an approved power project in Bapcha, Agar, Agar Malwa, Madhya Pradesh. The site covers 103.5 acres. Its stated project cost is ₹2 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 28 Apr 2026).

See it on the live map All projects in Agar Malwa

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusForest land use approved
Status since28 Apr 2026
Application filed30 May 2025
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantOyster Renewable Energy Private Limited
Land area103.5 acres (41.9 ha)
Forest land2.4 acres (1 ha)
Project cost₹2 lakh
Village / localityBapcha
Taluk / tehsilAgar
DistrictAgar Malwa
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-10350

Where it is

Bapcha, Agar, Agar Malwa, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.