Project details
| Status | Forest land use approved |
|---|---|
| Status since | 22 Apr 2026 |
| Application filed | 23 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Executive Engineer Public Health Engineering Division |
| Land area | 6.5 acres (2.6 ha) |
| Forest land | 5.6 acres (2.3 ha) |
| Project cost | ₹270.7 crore |
| Village / locality | Bisani |
| Taluk / tehsil | Shahnagar |
| District | Panna |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10393 |
In context
25 applications in Panna since January 2022 are in the same category (Water & irrigation): 10 approved, 8 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 21 months from filing to approval. At 6.5 acres, this one is smaller than 68% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bisani, Shahnagar, Panna, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Approach Bridge. — forest land use approved, 4.4 km away
- Pawai Byarma Multi Village Scheme — forest land use approved, 6.5 km away
- Jhiriya Harischandra-Chehkana-Ghona Road — more information requested, 6.8 km away
- Jhanjhar Flag Stone Quarry — environmental approval granted, 7.4 km away
- Ghuna Flag Stone Quarry — lapsed, 8.8 km away
- Naradpur Flag Stone Quarry — lapsed, 11.4 km away
- Chaupra Flag Stone Quarry — environmental approval granted, 12.9 km away
- Kaimuria Flag Stone Quarry — environmental approval granted, 15.5 km away
More from Executive Engineer Public Health Engineering Division in Panna
- Pawai Byarma Multi village Rural water Supply Schemes — under forest review
- Singhaura-II — under forest review
- Singhaura-II — under wildlife review
- Singhaura-02 Multi Village Scheme Drinking Water Panna — more information requested
- Pawai Byarma Multi Village Rural Water Supply Scheme Panna — lapsed
- Singhaura-02 Multi Village Scheme, Panna — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.