Quick answers
What is this project?
Jio Digital Fiber Pvt Ltd OFC 5G Project in ROW Corridor of Principal road authority route-Buddha-Jhiri road LM connectivity Hussainpur is a lapsed telecom project in Balapur, Pohri, Shivpuri, Madhya Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Jio Digital Fibre Private LTD.
Has it been approved?
No. The application was lapsed on 9 Oct 2025, so it is no longer under consideration.
Where is it?
In Balapur, Pohri, Shivpuri, Madhya Pradesh.
How big is it?
It has a stated cost of ₹4 lakh; a site of 0 acres and 730 m² of forest land.
When was it filed?
The application was filed on 4 Sept 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Oct 2025 |
| Application filed | 4 Sept 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Jio Digital Fibre Private LTD |
| Land area | 100 m² |
| Forest land | 730 m² |
| Project cost | ₹4 lakh |
| Village / locality | Balapur |
| Taluk / tehsil | Pohri |
| District | Shivpuri |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10500 |
In context
26 applications in Shivpuri since January 2022 are in the same category (Telecom): 8 approved, 5 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 23 days from filing to approval. At 0 acres, this one is smaller than 100% of them.
Where it is
Balapur, Pohri, Shivpuri, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kalamadh Stone Quarry — environmental approval granted, 11.9 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed, 12.5 km away
- Magroni Stone Quarry — under environmental review, 12.9 km away
- Magroni Crusher Stone Quarry — under environmental review, 13.6 km away
- Magroni Stone & M-Sand Quarry — under environmental review, 14.5 km away
- 11KV Govardhan DLF Feeder Bifurcation Line Under Rdss Loss Reduction Scheme — lapsed, 14.9 km away
- Common Bio Medical Waste Treatment Facility (CBWTF) — environmental approval granted, 16.2 km away
- 4G saturation — lapsed, 17.1 km away
More from Jio Digital Fibre Private LTD in Shivpuri
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt. Ltd. Linear OFC 5G Project In Row Corridor of Principal… — forest land use approved
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved
- Jio Digital Fiber Pvt Ltd Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved
18 Jio Digital Fibre projects in Shivpuri
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.