Quick answers
What is this project?
Diversion of Forest Land for Proposed of 3rd Railway Line Between Jujharpur (Km.751+100) to Chichonda (Km. 911+700) Central Railway (Cr), Nagpur Division of Total Length of 160.60 in Narmadapuram and Betul Districts of Madhya Pradesh is a proposed railway project in Chikalda, Shahpur, Betul, Madhya Pradesh. The site covers 2,378.4 acres.
Who is building it?
The applicant is Central Railway Cst Mumbai.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Chikalda, Shahpur, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹382.2 crore; a site of 2,378.4 acres and 16 acres (6.5 ha) of forest land.
When was it filed?
The application was filed on 1 Aug 2025.
Project details
| Official title | Proposal for Diversion of Forest Land for Proposed of 3rd Railway Line Between Jujharpur (Km.751+100) to Chichonda (Km. 911+700) Central Railway (Cr), Nagpur Division of Total Length of 160.60 in Narmadapuram and Betul Districts of Madhya Pradesh |
|---|---|
| Status | More information requested |
| Status since | 28 Oct 2026 |
| Application filed | 1 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | Central Railway Cst Mumbai |
| Land area | 2,378.4 acres (962.5 ha) |
| Forest land | 16 acres (6.5 ha) |
| Project cost | ₹382.2 crore |
| Village / locality | Chikalda |
| Taluk / tehsil | Shahpur |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10501 |
In context
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chikalda, Shahpur, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Guwadi-1 Sand Quarry (5.000 Ha.) — lapsed, 1.3 km away
- Guwadi Sand Mine Quarry — environmental approval granted, 1.7 km away
- Guwadi Sand Mine — environmental approval granted, 1.7 km away
- Guwadi-2 Sand Quarry (4.500 Ha.) — more information requested, 2.5 km away
- GURGUNDA-1 SAND QUARRY (4.900 Ha.) — lapsed, 3.8 km away
- New 33/11 KV Substation — lapsed, 4 km away
- Construction of 33/11 KV Electric Substation at Village-Gurgunda — lapsed, 4 km away
- Crusher Stone Quarry Project — environmental approval granted, 5.5 km away
More from Central Railway Cst Mumbai in Betul
- Diversion of 23.4011 Ha Forest Land for Proposed 3rd Railway Line Between… — under forest review
All 4 Central Railway Cst Mumbai projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.