Quick answers
What is Bichhiya NH 30 to Sarhi Gate Road Length 8.90 Km.?
Bichhiya NH 30 to Sarhi Gate Road Length 8.90 Km is an approved road project in Bhanpur, Bichhiya, Mandla, Madhya Pradesh. The site covers 2.4 acres.
Who is building it?
The applicant is Ee Pwd Division Mandla.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 22 Oct 2024), as of 27 Nov 2026.
Where is it?
In Bhanpur, Bichhiya, Mandla, Madhya Pradesh.
How big is it?
It has a stated cost of ₹18.5 crore; a site of 2.4 acres and 2.4 acres (1 ha) of forest land.
When was it filed?
The application was filed on 13 Jul 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 22 Oct 2024 |
| Application filed | 13 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ee Pwd Division Mandla |
| Land area | 2.4 acres (1 ha) |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹18.5 crore |
| Village / locality | Bhanpur |
| Taluk / tehsil | Bichhiya |
| District | Mandla |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10614 |
In context
35 applications in Mandla since January 2022 are in the same category (Roads & highways): 6 approved, 9 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 2.4 acres, this one is smaller than 61% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhanpur, Bichhiya, Mandla, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Halon Multi Village Water Supply Scheme (4.96ha.) — forest land use approved, 3.7 km away
- Temporary Anti Naxal camp — lapsed, 6.2 km away
- CC Road Chhatar ke Ghar se Dallu ke Ghar tak — application filed, 6.6 km away
- Cc Sadak Nirman Karya Panchayat Bhawwan Se Mukhya Mard Tak Kisli Bhilwani — application filed, 7.6 km away
- Laying of Drinking water pipeline — more information requested, 7.8 km away
- Halon Multi Village Water Supply Scheme — forest land use approved, 8.2 km away
- Halon Multi Village Water Supply Scheme — forest land use approved, 9.7 km away
- Koko Sand Mine — environmental approval granted, 10.9 km away
More from Ee Pwd Division Mandla in Mandla
- Construction of Rest House Ghughri — initial checks
- Construction of Pondi to Mohantola Road Length 1.20 Km. — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.