Quick answers
What is this project?
Diversion of Forest land for Upgradation to Two Lanes with paved shoulder/ Four Lane configuration of Pichhore-Dinara Road Section II (from KM 55.200 to KM 96.986) which is part of Newly Declared NH-346 in the state of Madhya Pradesh is an approved road project in Garhrauli, Pichhore, Shivpuri, Madhya Pradesh. The site covers 302.3 acres.
Who is building it?
The applicant is Morth (Nh-Mp).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 17 Dec 2025), as of 27 Nov 2026.
Where is it?
In Garhrauli, Pichhore, Shivpuri, Madhya Pradesh.
How big is it?
It has a stated cost of ₹271 crore; a site of 302.3 acres and 10.5 acres (4.2 ha) of forest land.
When was it filed?
The application was filed on 21 Apr 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 17 Dec 2025 |
| Application filed | 21 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Morth (Nh-Mp) |
| Land area | 302.3 acres (122.4 ha) |
| Forest land | 10.5 acres (4.2 ha) |
| Project cost | ₹271 crore |
| Village / locality | Garhrauli |
| Taluk / tehsil | Pichhore |
| District | Shivpuri |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10627 |
In context
32 applications in Shivpuri since January 2022 are in the same category (Roads & highways): 5 approved, 10 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 302.3 acres, this one is larger than 92% of them.
Where it is
Garhrauli, Pichhore, Shivpuri, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chhitipur Sand Quarry Deposit — lapsed, 11 km away
- Chhitipur Sand Quarry Deposit — cleared for impact study, 11 km away
- Mahowadamron Sand Quarry Deposit — lapsed, 13.9 km away
- Mahowadamron Sand Quarry Deposit — cleared for impact study, 13.9 km away
- Kamalpur Stone(Gitti & M Sand) Quarry — initial checks, 15.6 km away
- Kamalpur Stone(Gitti & M Sand) Quarry — under environmental review, 15.6 km away
- Garetha Stone (Gitti) & M-Sand Mine-4.0ha. — environmental approval granted, 15.6 km away
- Garetha Stone (Gitti) & M-Sand Mine-4.0ha. — cleared for impact study, 15.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.