Project details
| Status | Forest land use approved |
|---|---|
| Status since | 21 Apr 2026 |
| Application filed | 18 Jun 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Madhya Pradesh Jal Nigam Maryadit Shahdol |
| Land area | 28.6 acres (11.6 ha) |
| Forest land | 7.3 acres (2.9 ha) |
| Project cost | ₹2.8 crore |
| Village / locality | Kushiyara |
| Taluk / tehsil | Gopadbanas |
| District | Sidhi |
| State | Madhya Pradesh |
| Location from | Site area on record |
| Our reference | WID-MP-10664 |
In context
29 applications in Sidhi since January 2022 are in the same category (Water & irrigation): 10 approved, 10 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 17 months from filing to approval. At 28.6 acres, this one is larger than 50% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kushiyara, Gopadbanas, Sidhi, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mata Stone Quarry — environmental approval granted, 3.7 km away
- Preliminary Exploration of low-grade iron in Mauhariya block, Sidhi district,… — more information requested, 7.6 km away
- Pvtg — lapsed, 8.6 km away
- Sidhi Gulabsagar MVS — forest land use approved, 8.6 km away
- Gulabsagar MVS Water Supply Project — forest land use approved, 8.6 km away
- Amended Bharat Net/BSNL Linear UG OFC laying Project in Majhauli Block, DFO… — more information requested, 10.7 km away
- Preliminary Exploration Survey of granite-Marble Minerals in Compartment RF… — lapsed, 11 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed, 12.3 km away
More from Madhya Pradesh Jal Nigam Maryadit Shahdol in Sidhi
- Sidhi Gulabsagar MVS — forest land use approved
- Kotma to Keshlar and Umariya to Badiya Water Pipe Line — lapsed
- Mbr Dhanuali Water Supply Project — lapsed
- Sidhi Bansagar MVS — lapsed
- Sidhi Bansagar Mvs — decision issued
6 Madhya Pradesh Jal Nigam Maryadit Shahdol projects in Sidhi
All 11 Madhya Pradesh Jal Nigam Maryadit Shahdol projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.