What is Developing? Open the mapMap

Forest land use approvedTelecom · Sagar, Madhya Pradesh

Grant of Right of Way (RoW) Permission for Laying Optical Fiber Cable (OFC) along the Banda-Hirapur route

Grant of Right of Way (RoW) Permission for Laying Optical Fiber Cable (OFC) along the Banda-Hirapur route is an approved telecom project in Amarmau, Shahgarh, Sagar, Madhya Pradesh. The site covers 6.6 acres. Its stated project cost is ₹1 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 31 Oct 2026).

See it on the live map All projects in Sagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusForest land use approved
Status since31 Oct 2026
Application filed8 Oct 2026
Approval soughtForest land use
Application typeChange of use
SectorTelecom
ApplicantDe Tp I Wmp Bhopal
Land area6.6 acres (2.7 ha)
Forest land2.2 acres (0.9 ha)
Project cost₹1 crore
Village / localityAmarmau
Taluk / tehsilShahgarh
DistrictSagar
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-10715

In context

31 applications in Sagar since January 2022 are in the same category (Telecom): 11 approved, 9 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6.6 acres, this one is larger than 88% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Amarmau, Shahgarh, Sagar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.