Project details
| Official title | Proposal for diversion of Forest Land for upgradation of Chiklod Raisen Road in Raisen District of Madhya Pradesh under FCA 1980 |
|---|---|
| Status | More information requested |
| Status since | 5 Jul 2025 |
| Application filed | 4 Dec 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Mprdc Bhopal Division |
| Land area | 72.5 acres (29.3 ha) |
| Forest land | 45.8 acres (18.6 ha) |
| Project cost | ₹54.1 crore |
| Village / locality | Raisen Reserved Forest |
| Taluk / tehsil | Raisen |
| District | Raisen |
| State | Madhya Pradesh |
| Location from | Site area on record |
| Our reference | WID-MP-10726 |
In context
26 applications in Raisen since January 2022 are in the same category (Roads & highways): 7 approved, 7 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 72.5 acres, this one is larger than 71% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Raisen Reserved Forest, Raisen, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved, 3.4 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved, 4.3 km away
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed, 4.3 km away
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed, 4.3 km away
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed, 4.3 km away
- Jio Digital Fiber Pvt. Ltd. OFC 5G Project Bhopal-Raisen route DFO Obedullaganj — lapsed, 4.3 km away
- Barna Dam Multi Village Drinking Water Supply Scheme, District Raisen in the… — forest land use approved, 6.9 km away
- Kamton Kansiya Stone Quarry — lapsed, 9.6 km away
More from Mprdc Bhopal Division in Raisen
- Diversion of forest land for construction of Haidargarh -Begamganj Road in… — forest land use approved
- Gairatganj to Silwani(SH-44) to Batera (SH-15)-Bareli to Pipariya (SH-19). — lapsed
- Gairatganj to Silwani (SH-44) to Batera (SH-15)- Bareli to Pipariya (SH-19). — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.