Quick answers
What is Bsnl 4g Lwe Mha Project (Forest Camp Lodhabarra)?
Bsnl 4g Lwe Mha Project (Forest Camp Lodhabarra) is a proposed project in R.F., Baihar, Balaghat, Madhya Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Niraj Wasnik.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In R.F., Baihar, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹10 lakh; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 21 Dec 2025.
Project details
| Status | Under forest review |
|---|---|
| Status since | 24 Nov 2026 |
| Application filed | 21 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Niraj Wasnik |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹10 lakh |
| Village / locality | R.F. |
| Taluk / tehsil | Baihar |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10727 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Dec 2025 (this page) | Under forest review | 0 acres | ₹10 lakh |
| New project filed 25 Nov 2025 | Under wildlife review | 0 acres | ₹10 lakh |
In context
31 applications in Balaghat since January 2022 are in the same category (Other): 6 approved, 18 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 30 days from filing to approval. At 0 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
R.F., Baihar, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4g Lwe Mha Project (Forest Camp Lodhabarra) — under wildlife review, 0 m away
- Bsnl 4g Lwe Mha Project (Forest Camp Katangi Dadar) — under forest review, 4.9 km away
- Bsnl 4g Lwe Mha Project (Forest Camp Katangi Dadar) — under wildlife review, 4.9 km away
- Supkhar Mobile Tower — decision issued, 5.6 km away
- Supkhar Mobile Tower — under wildlife review, 6.1 km away
- Supkhar Mobile Tower — lapsed, 6.1 km away
- Supkhar Mobile Tower — lapsed, 6.1 km away
- Supkhar Mobile Tower — lapsed, 6.1 km away
More from Niraj Wasnik in Balaghat
- Bsnl 4g Lwe Mha Project (Forest Camp Bamhani Dadar) — under forest review
- Bsnl 4g Lwe Mha Project (Forest Camp Laduwa) — under forest review
- Bsnl 4g Lwe Mha Project (Forest Camp Katangi Dadar) — under forest review
- Bsnl 4g Lwe Mha Project (Forest Camp Khamodi Dadar) — under forest review
- Bsnl 4g Lwe Mha Project (Forest Camp Adawar) — under forest review
- Bsnl 4g Lwe Mha Project (Forest Camp Bamhani Dadar) — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.