Quick answers
What is this project?
Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal road authority Shubh Kannpur-Karmasan Hata route DFO Chhatarpur is a lapsed road project in Ahar, Baldeogarh, Tikamgarh, Madhya Pradesh. The site covers 1.1 acres.
Who is building it?
The applicant is Jio Digital Fibre Private LTD.
Has it been approved?
No. The application was lapsed on 14 Sept 2023, so it is no longer under consideration.
Where is it?
In Ahar, Baldeogarh, Tikamgarh, Madhya Pradesh.
How big is it?
It has a stated cost of ₹32 lakh and a site of 1.1 acres.
When was it filed?
The application was filed on 23 Mar 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Sept 2023 |
| Application filed | 23 Mar 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Jio Digital Fibre Private LTD |
| Land area | 1.1 acres (0.5 ha) |
| Project cost | ₹32 lakh |
| Village / locality | Ahar |
| Taluk / tehsil | Baldeogarh |
| District | Tikamgarh |
| State | Madhya Pradesh |
| Location from | Site area on record |
| Our reference | WID-MP-10737 |
In context
12 applications in Tikamgarh since January 2022 are in the same category (Roads & highways): 3 approved, 2 filed or under review, and 7 withdrawn, lapsed or rejected. At 1.1 acres, this one is larger than 50% of them.
Where it is
Ahar, Baldeogarh, Tikamgarh, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction Work of Lar to Luharra and Sukora Road — lapsed, 8.2 km away
- Badmadai Ugad Stone mine for making gitti & M-sand through Crusher — environmental approval granted, 8.5 km away
- Besaugad Stone Mine of Hemlata Solanki — lapsed, 8.9 km away
- Common Bio Medical Waste Treatment Facility (CBWTF) — environmental approval granted, 9.4 km away
- Kachhyakhera Ugad Stone (Gitti & M-sand) Mine — under environmental review, 11.9 km away
- Kachhyakhera Ugad M-Sand Mine — cleared for impact study, 12 km away
- Parsuwa Stone Mine — environmental approval granted, 12.3 km away
- PARSUWA STONE (GITTI & M-SAND) MINE of M/s DIVINE NATURAL RESOURSES PROPRIETOR… — under environmental review, 12.3 km away
More from Jio Digital Fibre Private LTD in Tikamgarh
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
9 Jio Digital Fibre projects in Tikamgarh
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.