Quick answers
What is this project?
Jio Digital Fiber Pvt Ltd Linear Ofc 5g Project In Row Corridor Of Principal Road Authority Bhonra-Lasudliya Vijaysingh Route Dfo Sehore is a lapsed road project in Anriya Ram, Ashta, Sehore, Madhya Pradesh. The site covers 0.1 acres.
Who is building it?
The applicant is Jio Digital Fibre Private LTD.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Anriya Ram, Ashta, Sehore, Madhya Pradesh.
How big is it?
It has a stated cost of ₹16 lakh and a site of 0.1 acres.
When was it filed?
The application was filed on 26 Dec 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Jul 2023 |
| Application filed | 26 Dec 2022 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Jio Digital Fibre Private LTD |
| Land area | 500 m² |
| Project cost | ₹16 lakh |
| Village / locality | Anriya Ram |
| Taluk / tehsil | Ashta |
| District | Sehore |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10870 |
In context
20 applications in Sehore since January 2022 are in the same category (Roads & highways): 4 approved, 6 filed or under review, and 10 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 100% of them.
Where it is
Anriya Ram, Ashta, Sehore, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rupeta Crusher Stone Mine — environmental approval granted, 6.3 km away
- KankariyaKhedi Crusher Stone Quarry for making Gitti — environmental approval granted, 6.6 km away
- Kankariya Khedi Crusher Stone Quarry — lapsed, 6.6 km away
- Khadaliya Viran Stone (Gitti & M-Sand) Mine- 2.0hac — under environmental review, 7.5 km away
- Malikhedi Stone & M-Sand Quarry — initial checks, 7.7 km away
- Malikhedi Stone & M-Sand Quarry — under environmental review, 7.7 km away
- Hakeempur Murrum Quarry — environmental approval granted, 8.5 km away
- Kannod Mirji Stone Quarry — under environmental review, 8.8 km away
More from Jio Digital Fibre Private LTD in Sehore
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed
10 Jio Digital Fibre projects in Sehore
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.