Quick answers
What is Village Teekar to dhuar Pcc road?
Village Teekar to dhuar Pcc road is a lapsed road project in Dhuar, Huzur, Rewa, Madhya Pradesh. The site covers 5.7 acres.
Who is building it?
The applicant is Executive Engineer Rural Engineerin Service.
Has it been approved?
No. The application was lapsed on 15 Apr 2026, so it is no longer under consideration.
Where is it?
In Dhuar, Huzur, Rewa, Madhya Pradesh.
How big is it?
It has a stated cost of ₹5 crore; a site of 5.7 acres and 2.5 acres (1 ha) of forest land.
When was it filed?
The application was filed on 3 Dec 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 15 Apr 2026 |
| Application filed | 3 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Rural Engineerin Service |
| Land area | 5.7 acres (2.3 ha) |
| Forest land | 2.5 acres (1 ha) |
| Project cost | ₹5 crore |
| Village / locality | Dhuar |
| Taluk / tehsil | Huzur |
| District | Rewa |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-10936 |
In context
8 applications in Rewa since January 2022 are in the same category (Roads & highways): 2 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhuar, Huzur, Rewa, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tikar Bauxite & White Clay Mine — cleared for impact study, 1.6 km away
- Tikar Bauxite Mine (32.00 Hect.) — lapsed, 2.1 km away
- Tikar Bauxite Mine (32.00 Hect.) — lapsed, 2.1 km away
- Tikar Bauxite Block ( Mine lease area – 95.26 Ha) by M/s. Katni Minerals… — cleared for impact study, 2.9 km away
- Mining Lease for Tikar Bauxite Phase-1 (28.379 Ha.) — under forest review, 2.9 km away
- Tikar Bauxite Block ( Mine lease area – 95.26 Ha) by M/s. Katni Minerals… — environmental approval granted, 2.9 km away
- 16.187ha Tikar B Bauxite mine — more information requested, 3.9 km away
- 16.187ha Tikar B Bauxite mine — more information requested, 3.9 km away