What is Developing? Open the mapMap

LapsedTelecom · Morena, Madhya Pradesh

OFC Laying at Chambal River Crossing in Pinahat

OFC Laying at Chambal River Crossing in Pinahat is a lapsed telecom project in Useth, Porsa, Morena, Madhya Pradesh. The site covers 0.2 acres. Its stated project cost is ₹9 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 19 Feb 2026).

See it on the live map All projects in Morena

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since19 Feb 2026
Application filed6 Dec 2024
Approval soughtForest land use
Application typeChange of use
SectorTelecom
ApplicantVikrant Solanki
Land area1,000 m²
Forest land1.6 acres (0.7 ha)
Project cost₹9 lakh
Village / localityUseth
Taluk / tehsilPorsa
DistrictMorena
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-11015

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Change of use filed 6 Dec 2024 (this page)Lapsed0.2 acres₹9 lakh
Change of use filed 5 Dec 2024Lapsed0.2 acres₹9 lakh

In context

12 applications in Morena since January 2022 are in the same category (Telecom): 2 approved, 3 filed or under review, and 7 withdrawn, lapsed or rejected.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Useth, Porsa, Morena, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Vikrant Solanki in Morena

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.