Project details
| Status | Forest land use approved |
|---|---|
| Status since | 21 Jul 2026 |
| Application filed | 20 Mar 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Sarvesh Gautam |
| Land area | 62 acres (25.1 ha) |
| Forest land | 3,810 m² |
| Project cost | ₹26.9 crore |
| Village / locality | Manegeon |
| Taluk / tehsil | Deori |
| District | Sagar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11149 |
In context
13 applications in Sagar since January 2022 are in the same category (Power): 5 approved, 2 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 17 months from filing to approval. At 62 acres, this one is smaller than 83% of them.
Where it is
Manegeon, Deori, Sagar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kishangarh Minor Irrigation Tank — lapsed, 7 km away
- Kishangarh Tank Minor Irrigation Scheme — forest land use approved, 7 km away
- Khatola Complex Minor Irrigation Project — lapsed, 7.3 km away
- Bsnl 4g Saturation Project Tower Suna — under wildlife review, 8.2 km away
- BSNL 4G saturation BTS SUNA — more information requested, 8.2 km away
- 4G saturation BTS Suna — more information requested, 8.2 km away
- BSNL 4G saturation BTS Amritjhiriya — more information requested, 8.8 km away
- 4G saturation BTS Amritjhiriya — lapsed, 8.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.