What is OFC Project for Ajroda-Jhanjhon-Murwas Under DFO Guna?
OFC Project for Ajroda-Jhanjhon-Murwas Under DFO Guna is an approved telecom project in Purena, Raghogarh, Guna, Madhya Pradesh. The site covers 2.4 acres.
Who is building it?
The applicant is Bharti Aitrtel Ltd..
Has it been approved?
Yes. Its status is “Forest land use approved” (since 13 Dec 2025), as of 27 Nov 2026.
Where is it?
In Purena, Raghogarh, Guna, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1.1 crore; a site of 2.4 acres and 2 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 28 Nov 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 13 Dec 2025 |
| Application filed | 28 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharti Aitrtel Ltd. |
| Land area | 2.4 acres (1 ha) |
| Forest land | 2 acres (0.8 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Purena |
| Taluk / tehsil | Raghogarh |
| District | Guna |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11171 |
In context
26 applications in Guna since January 2022 are in the same category (Telecom): 7 approved, 0 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.4 acres, this one is larger than 84% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Purena, Raghogarh, Guna, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 11 Kv Water Works Abadi Feeder under RDSS Feeder Saparetion Project (11KV Line) — forest land use approved, 1.9 km away
- 11 Kv Water Works Abadi Feeder under RDSS Feeder Saparetion Project (11KV Line) — lapsed, 2 km away
- Diversion of Forest Land for Construction of Mobile Tower at Bandargarha — lapsed, 2.8 km away
- 11kv Bhilera Abadi Feeder-2 KV Mix Feeder & Mix DTRs under RDSS Feeder… — forest land use approved, 7.7 km away
- Kolua Maidani Murrum Quarry — environmental approval granted, 8.1 km away
- Allipura Stone Quarry — environmental approval granted, 8.3 km away
- Allipura Stone Quarry — environmental approval granted, 8.4 km away
- Diversion of Forest Land for Construction of Mobile Tower at Sompur — lapsed, 8.6 km away
All 3 Bharti Aitrtel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.