Quick answers
What is this project?
Indirasagar-Omkareshwar(640mw)on- Stream Pumped Storage Project is an approved project in Chandgarh R F, Harsud, East Nimar, Madhya Pradesh. The site covers 489.3 acres.
Who is building it?
The applicant is Nhdc Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 2 Jul 2025), as of 27 Nov 2026.
Where is it?
In Chandgarh R F, Harsud, East Nimar, Madhya Pradesh.
How big is it?
It has a stated cost of ₹4,756.5 crore and a site of 489.3 acres.
When was it filed?
The application was filed on 28 May 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 2 Jul 2025 |
| Application filed | 28 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Nhdc Limited |
| Land area | 489.3 acres (198 ha) |
| Project cost | ₹4,756.5 crore |
| Village / locality | Chandgarh R F |
| Taluk / tehsil | Harsud |
| District | East Nimar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11238 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 May 2025 (this page) | Forest land use approved | 489.3 acres | ₹4,756.5 crore |
| New project filed 18 Apr 2024 | Forest land use approved | 100.4 acres | ₹4,756.5 crore |
In context
12 applications in East Nimar since January 2022 are in the same category (Other): 3 approved, 2 filed or under review, and 7 withdrawn, lapsed or rejected. At 489.3 acres, this one is larger than 92% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chandgarh R F, Harsud, East Nimar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Indirasagar-Omkareshwar on-stream Pumped Storage Project (8x80= 640 MW) — under forest review, 0 m away
- Proposed Indirasagar-Omkareshwar on-stream Pumped Storage Project (8x80= 640 MW) — lapsed, 0 m away
- Proposed Indirasagar-Omkareshwar on-stream Pumped Storage Project (8x80= 640 MW) — cleared for impact study, 0 m away
- Indirasagar-Omkareshwar(640mw)on- Stream Pumped Storage Project — forest land use approved, 450 m away
- Chikdhaliya to Punasa-Narmadanagar main Road — lapsed, 7 km away
- Chikdhaliya to Punasa-Narmadanagar main Road — lapsed, 7.1 km away
- Bawadikheda to Pamakhedi Phata Road — more information requested, 7.5 km away
- अमृत 2.0 योजना अंतर्गत पानी की टंकी निर्माण कार्य by Nagar Parishad Punasa — lapsed, 9.2 km away
More from Nhdc Limited in East Nimar
- Proposed Indirasagar-Omkareshwar on-stream Pumped Storage Project (8x80= 640 MW) — lapsed
- Forest Clearance for 37.48 Ha Forest Land (Chote Jhad Ka Jungle) for Muck… — lapsed
- Proposed Indirasagar-Omkareshwar on-stream Pumped Storage Project (8x80= 640 MW) — under forest review
- Proposed Indirasagar-Omkareshwar on-stream Pumped Storage Project (8x80= 640 MW) — cleared for impact study
6 Nhdc projects in East Nimar
All 7 Nhdc projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.