Project details
| Status | Forest land use approved |
|---|---|
| Status since | 27 Apr 2026 |
| Application filed | 4 Jan 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Agm Bharat Net Bsnl Dhar Mp |
| Land area | 600 m² |
| Forest land | 1,030 m² |
| Project cost | ₹5 lakh |
| Village / locality | Sardarpur Rf |
| Taluk / tehsil | Gandhwani |
| District | Dhar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11265 |
All filings for this project
This project has 7 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 1 Sept 2024 | Lapsed | 0.1 acres | ₹5 lakh |
| Change of use filed 25 Jul 2024 | Lapsed | 0.1 acres | ₹5 lakh |
| Change of use filed 25 Jul 2024 | Lapsed | 0.1 acres | ₹5 lakh |
| Change of use filed 24 Jul 2024 | Lapsed | 0.1 acres | ₹5 lakh |
| Change of use filed 28 Feb 2024 | Lapsed | 0.1 acres | ₹5 lakh |
| Change of use filed 14 Jan 2024 | Lapsed | 0.1 acres | ₹5 lakh |
| Change of use filed 4 Jan 2024 (this page) | Forest land use approved | 0.1 acres | ₹5 lakh |
In context
21 applications in Dhar since January 2022 are in the same category (Telecom): 6 approved, 0 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.1 acres, this one is smaller than 94% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sardarpur Rf, Gandhwani, Dhar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4g Saturation (Mission 500) — lapsed, 0 m away
- 4g Saturation (Mission 500) — lapsed, 0 m away
- 4g Saturation (Mission 500) — lapsed, 0 m away
- 4g Saturation (Mission 500) — lapsed, 0 m away
- 4g Saturation (Mission 500) — lapsed, 0 m away
- 4g Saturation (Mission 500) — lapsed, 50 m away
- Maan Dam (Multi Village Scheme) Drinking Water Supply Project — forest land use approved, 800 m away
- OFC Laying of 4G Tower Ramgad_Bhuriyakund _Gungidevi — lapsed, 3.2 km away
More from Agm Bharat Net Bsnl Dhar Mp in Dhar
- Amjhera to Kesavi to Zeerabad OFC Route laying work of BSNL Dhar — lapsed
- BSNL 4G Saturation ADSS Over Head OFC Laying of OA Dhar — forest land use approved
- LALGARH 4G Site — lapsed
- OFC Laying of 4G Tower Ramgad_Bhuriyakund _Gungidevi — lapsed
- Kesavi To Zeerabad BSNL OFC rehabilitation work — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.