Quick answers
What is this project?
Diversion of Forest Land for Construction of Mobile Tower at Raipur is a lapsed telecom project in Raipur R F, Shivpuri, Madhya Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Indus Towers LTD.
Has it been approved?
No. The application was lapsed on 17 Jan 2026, so it is no longer under consideration.
Where is it?
In Raipur R F, Shivpuri, Madhya Pradesh.
How big is it?
It has a stated cost of ₹32 lakh; a site of 0 acres and 230 m² of forest land.
When was it filed?
The application was filed on 3 Nov 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Jan 2026 |
| Application filed | 3 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Indus Towers LTD |
| Land area | 200 m² |
| Forest land | 230 m² |
| Project cost | ₹32 lakh |
| Village / locality | Raipur R F |
| Taluk / tehsil | Shivpuri |
| District | Shivpuri |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11319 |
In context
26 applications in Shivpuri since January 2022 are in the same category (Telecom): 8 approved, 5 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 23 days from filing to approval. At 0 acres, this one is smaller than 96% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Raipur R F, Shivpuri, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved, 150 m away
- Work of Augmentation of Water Supply System of Shivpuri Town Under Amrut 2.0… — more information requested, 4.9 km away
- 11KV Madikheda DLF Feeder Extension for Electrification of Village Bheempur… — lapsed, 6.7 km away
- 11KV Madikheda DLF Feeder Extension for Electrification of Village Gopaliya… — lapsed, 7.1 km away
- Replacement of Old Grp Line by New Di Line for Shivpuri Water Supply Under… — decision issued, 7.7 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed, 7.9 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed, 7.9 km away
- Work of Augmentation of Water Supply System of Shivpuri Town Under Amrut 2.0… — lapsed, 7.9 km away
More from Indus Towers LTD in Shivpuri
- Diversion of Forest Land for Construction of Mobile Tower at Rundsarkar — under wildlife review
- Diversion of Forest Land for Construction of Mobile Tower — under wildlife review
- Diversion of Forest Land for Construction of Mobile Tower — lapsed
- Diversion of 0.0232ha of Forest Land for Construction of Mobile Tower at Sihora — lapsed
- Diversion of Forest Land for Construction of Mobile Tower at Chur — lapsed
- Diversion of Forest Land for Construction of Mobile Tower at Gora — lapsed
10 Indus Towers projects in Shivpuri
All 165 Indus Towers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.