What is Developing? Open the mapMap

LapsedWater & irrigation · Raisen, Madhya Pradesh

Barna Dam Multi Village Drinking Water Supply Scheme, District Raisen

Barna Dam Multi Village Drinking Water Supply Scheme, District Raisen is a lapsed water and irrigation project in Bamhori Wazirganj, Badi, Raisen, Madhya Pradesh. The site covers 8.9 acres. Its stated project cost is ₹16.1 crore. As of 27 Nov 2026, its status is “Lapsed” (since 22 Dec 2025).

See it on the live map All projects in Raisen

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since22 Dec 2025
Application filed11 Jun 2024
Approval soughtForest land use
Application typeNew project
SectorWater & irrigation
ApplicantPublic Works Department
Land area8.9 acres (3.6 ha)
Forest land7.4 acres (3 ha)
Project cost₹16.1 crore
Village / localityBamhori Wazirganj
Taluk / tehsilBadi
DistrictRaisen
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-11334

In context

23 applications in Raisen since January 2022 are in the same category (Water & irrigation): 5 approved, 9 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 8.9 acres, this one is smaller than 59% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bamhori Wazirganj, Badi, Raisen, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 40 Public Works Department, Madhya Pradesh projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.