Quick answers
What is this project?
Diversion of Forest Land for Construction of Mobile Tower at Kanera Chhapar is a lapsed telecom project in Kanera Chhapar, Badarwas, Shivpuri, Madhya Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Indus Towers LTD.
Has it been approved?
No. The application was lapsed on 17 Jan 2026, so it is no longer under consideration.
Where is it?
In Kanera Chhapar, Badarwas, Shivpuri, Madhya Pradesh.
How big is it?
It has a stated cost of ₹32 lakh; a site of 0 acres and 230 m² of forest land.
When was it filed?
The application was filed on 3 Nov 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Jan 2026 |
| Application filed | 3 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Indus Towers LTD |
| Land area | 200 m² |
| Forest land | 230 m² |
| Project cost | ₹32 lakh |
| Village / locality | Kanera Chhapar |
| Taluk / tehsil | Badarwas |
| District | Shivpuri |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11405 |
In context
26 applications in Shivpuri since January 2022 are in the same category (Telecom): 8 approved, 5 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 23 days from filing to approval. At 0 acres, this one is smaller than 96% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kanera Chhapar, Badarwas, Shivpuri, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0232ha of Forest Land for Construction of Mobile Tower at Sihora — lapsed, 2.6 km away
- Behanga to Bhensoda via Ajalpur — initial checks, 7.4 km away
- Bharti Airtel Ltd. 5G OFC Project Kapasi-Sirsi-Badarwas Route DFO Shivpuri — forest land use approved, 9.5 km away
- Atalpur Stone Quarry — environmental approval granted, 12.9 km away
- Atalpur Stone Quarry — environmental approval granted, 13 km away
- Atalpur Stone (Gitti) , M-Sand & Boulder — under environmental review, 13.2 km away
- Atalpur Stone (Gitti) , M-Sand & Boulder — under environmental review, 13.2 km away
- Gudhal Stone (Gitty) & M- Sand Quarry — lapsed, 13.9 km away
More from Indus Towers LTD in Shivpuri
- Diversion of Forest Land for Construction of Mobile Tower at Rundsarkar — under wildlife review
- Diversion of Forest Land for Construction of Mobile Tower — under wildlife review
- Diversion of Forest Land for Construction of Mobile Tower — lapsed
- Diversion of 0.0232ha of Forest Land for Construction of Mobile Tower at Sihora — lapsed
- Diversion of Forest Land for Construction of Mobile Tower at Chur — lapsed
- Diversion of Forest Land for Construction of Mobile Tower at Gora — lapsed
10 Indus Towers projects in Shivpuri
All 165 Indus Towers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.