Quick answers
What is this project?
Diversion of Existing Road Passing through Gurhar Pahar Gold Block and Mineral Processing Plant is a lapsed road project in Sidhar, Chitrangi, Singrauli, Madhya Pradesh. It seeks 1.5 acres of forest land.
Who is building it?
The applicant is Kundan Gold Mines Private Limited.
Has it been approved?
No. The application was lapsed on 3 Sept 2026, so it is no longer under consideration.
Where is it?
In Sidhar, Chitrangi, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹5 lakh and 1.5 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 25 Jul 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 3 Sept 2026 |
| Application filed | 25 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Kundan Gold Mines Private Limited |
| Forest land | 1.5 acres (0.6 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Sidhar |
| Taluk / tehsil | Chitrangi |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11566 |
In context
27 applications in Singrauli since January 2022 are in the same category (Roads & highways): 6 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 14 months from filing to approval.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sidhar, Chitrangi, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Setting up a Mineral Processing and Metal Recovery unit of 3000 TPD (Phase 1:… — withdrawn, 1.6 km away
- Setting up a Gold Concentrate unit 3000 TPD (Phase 1: 500 TPD, Phase 2: 1000… — withdrawn, 1.6 km away
- Setting up a Mineral Processing and Metal Recovery unit of 6000 TPD (Phase 1:… — cleared for impact study, 1.6 km away
- Setting up a Mineral Processing and Metal Recovery unit of 6000 TPD (Phase 1:… — returned to applicant, 1.6 km away
- Setting up a Mineral Processing and Metal Recovery unit of 6000 TPD (Phase 1:… — returned to applicant, 1.6 km away
- Setting up a Mineral Processing and Metal Recovery unit of 1500 TPD (Phase 1:… — withdrawn, 1.6 km away
- sirgudi Stone Quarry — lapsed, 1.6 km away
- Approval of Mining Plan in respect of Gurhar Pahar Gold Block over an area of… — lapsed, 1.9 km away
More from Kundan Gold Mines Private Limited in Singrauli
- Gurhar Pahar Gold Block, Singrauli, Madhya Pradesh — forest land use approved
- Setting up a Mineral Processing and Metal Recovery unit of 6000 TPD (Phase 1:… — cleared for impact study
- Eastern Extension of Sonkurwa Gold Block, Singrauli, Madhya Pradesh — forest land use approved
- Setting up a Mineral Processing and Metal Recovery unit of 6000 TPD (Phase 1:… — returned to applicant
- Setting up a Mineral Processing and Metal Recovery unit of 6000 TPD (Phase 1:… — returned to applicant
- Setting up a Mineral Processing and Metal Recovery unit of 1500 TPD (Phase 1:… — withdrawn
17 Kundan Gold Mines projects in Singrauli
All 24 Kundan Gold Mines projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.