What is Detailed Exploration in Saristal Coal Block?
Detailed Exploration in Saristal Coal Block is a lapsed survey and exploration project in Bhalmudi, Kotma, Anuppur, Madhya Pradesh. The site covers 3,318.2 acres.
Who is building it?
The applicant is Central Mine Planning and Design Institute Limited.
Has it been approved?
No. The application was lapsed on 15 Oct 2026, so it is no longer under consideration.
Where is it?
In Bhalmudi, Kotma, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹11.6 crore; a site of 3,318.2 acres and 1,728 acres (699.3 ha) of forest land.
When was it filed?
The application was filed on 3 Sept 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 15 Oct 2026 |
| Application filed | 3 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Survey & exploration |
| Applicant | Central Mine Planning and Design Institute Limited |
| Land area | 3,318.2 acres (1,342.8 ha) |
| Forest land | 1,728 acres (699.3 ha) |
| Project cost | ₹11.6 crore |
| Village / locality | Bhalmudi |
| Taluk / tehsil | Kotma |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11601 |
In context
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhalmudi, Kotma, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved, 2.8 km away
- Beheraband North Extn Coal Mine — forest land use approved, 4 km away
- Proposed 4x800 MW Coal Based Ultra Super Critical Thermal Power Plant (USCTPP)… — environmental approval granted, 5 km away
- Proposed 4x800 MW Coal Based Ultra Super Critical Thermal Power Plant (USCTPP)… — cleared for impact study, 5 km away
- Residential Township of Anuppur Thermal Power Plant — under environmental review, 5 km away
- Chhatai Sand Quarry (4.500 Ha.) — lapsed, 5.2 km away
- Beheraband North Extn. Coal Mine — under forest review, 5.4 km away
- Proposed Railway Siding From Baihatola Station to Anuppur TPP Project site by… — under forest review, 5.8 km away
More from Central Mine Planning and Design Institute Limited in Anuppur
- South Side of Jhiria West OCP — lapsed
- Ghochimuda Coal Block — lapsed
- Kanaitola Coal Block — lapsed
4 Central Mine Planning projects in Anuppur
All 58 Central Mine Planning projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.