Quick answers
What is this project?
Vodafone Idea telecom infrastructure limited. 5G OFC Project Astha-Kannod route DFO SEHORE is an approved telecom project in Main Vindhya Rf, Kannod, Dewas, Madhya Pradesh. The site covers 6.7 acres.
Who is building it?
The applicant is Anirudh Sharma.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 10 Jun 2026), as of 27 Nov 2026.
Where is it?
In Main Vindhya Rf, Kannod, Dewas, Madhya Pradesh.
How big is it?
It has a stated cost of ₹16 lakh; a site of 6.7 acres and 2,340 m² of forest land.
When was it filed?
The application was filed on 3 Jun 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 10 Jun 2026 |
| Application filed | 3 Jun 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Anirudh Sharma |
| Land area | 6.7 acres (2.7 ha) |
| Forest land | 2,340 m² |
| Project cost | ₹16 lakh |
| Village / locality | Main Vindhya Rf |
| Taluk / tehsil | Kannod |
| District | Dewas |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11709 |
In context
20 applications in Dewas since January 2022 are in the same category (Telecom): 12 approved, 1 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 6.7 acres, this one is larger than 94% of them.
Where it is
Main Vindhya Rf, Kannod, Dewas, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Onkara to Juna Tanda Satal — under wildlife review, 14.7 km away
- Main Road to Badakhet Majratola — under wildlife review, 14.8 km away
- Omkara to Majra tola Tanda — under wildlife review, 15.6 km away
- Khivani Eco- Friendly Farm Stay — more information requested, 15.9 km away
- Kheoni Eco-Lodge — application filed, 16.4 km away
- 132 KV Transmission Line to Ph3 of Narmada Parwati Phase-I & II Micro Lift… — lapsed, 17 km away
- Vodafone Idea telecom infrastructure limited. 5G OFC Project Astha-Kannod… — forest land use approved, 17.4 km away
- Vikrampur to Utawali Pathar — under wildlife review, 19.9 km away
More from Anirudh Sharma in Dewas
- Vodafone Idea telecom infrastructure limited. 5G OFC Project Astha-Kannod… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.