Quick answers
What is 33 KV Interconnection Work Rdss?
33 KV Interconnection Work Rdss is a lapsed power project in Tumegaon, Nainpur, Mandla, Madhya Pradesh. It seeks 1 acre of forest land.
Who is building it?
The applicant is Pallav Swarnkar.
Has it been approved?
No. The application was lapsed on 25 Mar 2024, so it is no longer under consideration.
Where is it?
In Tumegaon, Nainpur, Mandla, Madhya Pradesh.
How big is it?
It has a stated cost of ₹88 lakh and 1 acres (0.4 ha) of forest land.
When was it filed?
The application was filed on 21 Dec 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Mar 2024 |
| Application filed | 21 Dec 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Power |
| Applicant | Pallav Swarnkar |
| Forest land | 1 acres (0.4 ha) |
| Project cost | ₹88 lakh |
| Village / locality | Tumegaon |
| Taluk / tehsil | Nainpur |
| District | Mandla |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11783 |
In context
7 applications in Mandla since January 2022 are in the same category (Power): 2 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tumegaon, Nainpur, Mandla, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 33 KV Line interconnection Between Pindrai and Kannargaon Substation — lapsed, 650 m away
- Tuiyapani Crusher Stone Quarry of Shri Vishnu Gumasta — environmental approval granted, 4.7 km away
- Chicholi Crusher Stone & M Sand Quarry — lapsed, 7.9 km away
- Paraswara Chak Crusher Stone Quarry Lease — environmental approval granted, 8.9 km away
- Paraswara Chak Crusher Stone Quarry Lease — cleared for impact study, 8.9 km away
- Gajna Crusher Stone & Murrum Quarry Project — under environmental review, 10.1 km away
- Khohari stone Quarry — environmental approval granted, 11.6 km away
- Kokiwada Murrum, Crusher Stone, Bolder & M Sand Mining Project — environmental approval granted, 12 km away
More from Pallav Swarnkar in Mandla
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.