Quick answers
What is Instalation of New 33KV Line From Kalaakhar to Sadhpura.?
Instalation of New 33KV Line From Kalaakhar to Sadhpura is a lapsed power project in Bhanwargarh Reserved Forest, Shahpur, Betul, Madhya Pradesh. The site covers 17.2 acres.
Who is building it?
The applicant is Madhya Pradesh Madhya Kshetra Vidut Vitran Com.
Has it been approved?
No. The application was lapsed on 23 Jan 2026, so it is no longer under consideration.
Where is it?
In Bhanwargarh Reserved Forest, Shahpur, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹4.1 crore; a site of 17.2 acres and 1.4 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 7 Oct 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Jan 2026 |
| Application filed | 7 Oct 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Madhya Pradesh Madhya Kshetra Vidut Vitran Com |
| Land area | 17.2 acres (7 ha) |
| Forest land | 1.4 acres (0.6 ha) |
| Project cost | ₹4.1 crore |
| Village / locality | Bhanwargarh Reserved Forest |
| Taluk / tehsil | Shahpur |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11796 |
In context
39 applications in Betul since January 2022 are in the same category (Power): 7 approved, 26 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 17.2 acres, this one is smaller than 77% of them.
Where it is
Bhanwargarh Reserved Forest, Shahpur, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4g Saturation Project 500 Days — lapsed, 5.1 km away
- 4g Saturation 500 Days Project — lapsed, 7.8 km away
- 4g Saturation Project 500 Days — initial checks, 9.6 km away
- Dabri Sand Quarry (4.500 Ha.) — lapsed, 10 km away
- Crusher Stone Quarry Project — environmental approval granted, 10.1 km away
- 4g Saturation Project — lapsed, 10.4 km away
- Bsnl 4g Saturation Project — forest land use approved, 10.5 km away
- New 11 KV Kharwar DLF Feeder, FSP Works under RDSS KfW(FSP) package — more information requested, 10.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.