What is this project?
Lilo of Both Circuit of Vindhyachal Ps-Sasan 400 KV D/C Line at Hindalco Switchyard is a proposed power project in Vihara Pf, Singrauli, Madhya Pradesh. The site covers 1,00,056 acres.
Who is building it?
The applicant is Power Grid Corporation of India (POWERGRID).
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Vihara Pf, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹370 crore; a site of 1,00,056 acres and 21 acres (8.5 ha) of forest land.
When was it filed?
The application was filed on 10 Aug 2025.
Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 19 Nov 2026 |
| Application filed | 10 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Power Grid Corporation of India (POWERGRID) |
| Land area | 1,00,056 acres (40,491.3 ha) |
| Forest land | 21 acres (8.5 ha) |
| Project cost | ₹370 crore |
| Village / locality | Vihara Pf |
| Taluk / tehsil | Singrauli |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11817 |
In context
16 applications in Singrauli since January 2022 are in the same category (Power): 9 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 13 months from filing to approval. At 1,00,056 acres, this one is larger than 94% of them.
32 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vihara Pf, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Naudhiya - 2 Sand Deposit — not approved, 1.4 km away
- Naudhiya - 2 Sand Deposit — cleared for impact study, 1.4 km away
- Basauda - 3 Sand Deposit — environmental approval granted, 1.5 km away
- Basauda - 3 Sand Deposit — cleared for impact study, 1.5 km away
- Basauda -1 Sand Deposit — environmental approval granted, 1.6 km away
- Basauda -1 Sand Deposit — cleared for impact study, 1.6 km away
- Rampa Sand Deposit — environmental approval granted, 1.7 km away
- Bhudkud-1 Sand Deposit — under environmental review, 1.8 km away
All 45 Power Grid Corporation of India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.