Quick answers
What is this project?
Km 45 of T02 to Kattiparkala Road Under Scheme of RCPLWEA Project is a road project in Sitapala, Lanji, Balaghat, Madhya Pradesh. The site covers 18.9 acres.
Who is building it?
The applicant is Anil Kumar Garhwal.
Has it been approved?
Yes. Its status is “Decision issued” (since 7 Mar 2024), as of 27 Nov 2026.
Where is it?
In Sitapala, Lanji, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹4.7 crore and a site of 18.9 acres.
When was it filed?
The application was filed on 7 Mar 2024.
Project details
| Status | Decision issued |
|---|---|
| Status since | 7 Mar 2024 |
| Application filed | 7 Mar 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Anil Kumar Garhwal |
| Land area | 18.9 acres (7.7 ha) |
| Project cost | ₹4.7 crore |
| Village / locality | Sitapala |
| Taluk / tehsil | Lanji |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11945 |
In context
52 applications in Balaghat since January 2022 are in the same category (Roads & highways): 5 approved, 19 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 2.2 years from filing to approval. At 18.9 acres, this one is larger than 84% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sitapala, Lanji, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4g Saturation Project at Sitapala South Balaghat — forest land use approved, 1.8 km away
- Road From Kandrikala to Kattipar Road — decision issued, 3.3 km away
- Preliminary Exploration (G3) for PGE, Gold and Basemetal in Timkitola Block,… — in-principle approval, conditions pending, 3.4 km away
- Reconnaissance Survey (G-4) for PGE, Vanadium & associated minerals in… — more information requested, 6.9 km away
- Reconnaissance Survey G-4 Stage for PGE, Gold and REE in Maneri- Sitapala Block — more information requested, 7.3 km away
- Sitapala Tattikala to Kosamdehi Road construction undre RCPLWEA SCHEME — decision issued, 9.3 km away
- Kadla to Bagdi BT Road — lapsed, 9.8 km away
- Bsnl 4g Saturation Project Balaghat — forest land use approved, 13.9 km away
More from Anil Kumar Garhwal in Balaghat
- Constriction of Road From Amatola To Ghursibehra in PMJANMAN SCHEAM — initial checks
- Fahehpur To Kukada Road — initial checks
- Khami to Tikariya — initial checks
- Mohgaon to Sawarjhodi Road — initial checks
- Maliya to Bindrapani — initial checks
- Mahrai To Baigatola Road — initial checks
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.