What is 33 KV Feeder From 220/33 KV Bijauri to Devri Line?
33 KV Feeder From 220/33 KV Bijauri to Devri Line is a proposed power project in Raksha, Manpur, Umaria, Madhya Pradesh. The site covers 45.2 acres.
Who is building it?
The applicant is Sudeep Kumar Gontiya.
Has it been approved?
Not yet. The application is still under review: its status is “Application filed”, as of 27 Nov 2026.
Where is it?
In Raksha, Manpur, Umaria, Madhya Pradesh.
How big is it?
It has a stated cost of ₹2.4 crore and a site of 45.2 acres.
When was it filed?
The application was filed on 24 Nov 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: 33 KV Feeder From 220/33 KV Bijauri to Devri Line
Project details
| Status | Application filed |
|---|---|
| Status since | 24 Nov 2025 |
| Application filed | 24 Nov 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Power |
| Applicant | Sudeep Kumar Gontiya |
| Land area | 45.2 acres (18.3 ha) |
| Project cost | ₹2.4 crore |
| Village / locality | Raksha |
| Taluk / tehsil | Manpur |
| District | Umaria |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-12034 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Jan 2026 | Under wildlife review | 45.2 acres | ₹2.4 crore |
| New project filed 24 Nov 2025 (this page) | Application filed | 45.2 acres | ₹2.4 crore |
In context
17 applications in Umaria since January 2022 are in the same category (Power): 0 approved, 7 filed or under review, and 10 withdrawn, lapsed or rejected. At 45.2 acres, this one is smaller than 65% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Raksha, Manpur, Umaria, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 33 KV Feeder From 220/33 KV Bijauri to Devri Line — under wildlife review, 0 m away
- 33 KV Feeder From 220/33 KV Bijauri to Devri Line — under forest review, 0 m away
- Govarde Badar Sand Mine — environmental approval granted, 1.3 km away
- 33 KV Feeder From 220/33 KV Bijauri to Dev -1 — lapsed, 2.1 km away
- Work of New 33 KV Line Interconnection From 220/33 KV Ss Bijauri to 33/11 KV… — lapsed, 2.6 km away
- 33 KV Line Bijori to Balhaud — under wildlife review, 2.7 km away
- Raksha Stone mine for making Gitti — environmental approval granted, 3.7 km away
- Govarde Sand Quarry — environmental approval granted, 4.3 km away
More from Sudeep Kumar Gontiya in Umaria
- 33 KV Line Bijori to Balhaud — under wildlife review
- 33 KV Line Bijori to Balhaud — withdrawn
- 33 KV Interconnection From 132/33 KV Ss Umaria to 33/11 KV Ss Kudra(Under Rdss… — more information requested
- 33 KV Feeder From 220/33 KV Bijauri to Devri Line — under forest review
- 33 KV Line Bijori to Balhaud — more information requested
- Construction of 33/11kv sub station Balhaud — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.