Quick answers
What is Mathar Pipe Water Supply Scheme at Block Budni Distt. Sehore?
Mathar Pipe Water Supply Scheme at Block Budni Distt. Sehore is a proposed water and irrigation project in R E H T I R E S E R V E D F O *, Rehti, Sehore, Madhya Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Pipe Water Supply Scheme Mathar Block Budni.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In R E H T I R E S E R V E D F O *, Rehti, Sehore, Madhya Pradesh.
How big is it?
It has a stated cost of ₹85 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 11 Dec 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 11 Dec 2025 |
| Application filed | 11 Dec 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Pipe Water Supply Scheme Mathar Block Budni |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹85 lakh |
| Village / locality | R E H T I R E S E R V E D F O * |
| Taluk / tehsil | Rehti |
| District | Sehore |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-12062 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Dec 2025 (this page) | More information requested | 2.5 acres | ₹85 lakh |
| New project filed 3 Dec 2025 | Lapsed | 2.5 acres | ₹85 lakh |
In context
16 applications in Sehore since January 2022 are in the same category (Water & irrigation): 4 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. At 2.5 acres, this one is smaller than 67% of them.
Where it is
R E H T I R E S E R V E D F O *, Rehti, Sehore, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mathar Pipe Water Supply Scheme at Block Budni Distt. Sehore — lapsed, 0 m away
- Semri Stone Quarry — environmental approval granted, 6.3 km away
- Semri Stone Quarry — under environmental review, 6.5 km away
- Semri Stone (Gitti) Quarry — environmental approval granted, 6.5 km away
- Bhadkul Stone Quarry — lapsed, 7.1 km away
- Dongri Crusher Stone Quarry — environmental approval granted, 7.2 km away
- Bhadkul Stone Mine — lapsed, 7.3 km away
- BHADKUL STONE MINE (Area of 1.000 Ha.) — not approved, 7.4 km away
More from Pipe Water Supply Scheme Mathar Block Budni in Sehore
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.