Quick answers
What is this project?
Optical Fiber Cable (OFC) Laying Work in Territorial Forest Area under Amended BharatNet Phase-III (ABP) Programme – District Guna, Madhya Pradesh is a proposed road project in Ahmadpur, Guna, Madhya Pradesh. It seeks 5.2 acres of forest land.
Who is building it?
The applicant is Bharat Sanchar Nigam Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Ahmadpur, Guna, Madhya Pradesh.
How big is it?
It has a stated cost of ₹38 lakh and 5.2 acres (2.1 ha) of forest land.
When was it filed?
The application was filed on 3 Nov 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 3 Nov 2026 |
| Application filed | 3 Nov 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Bharat Sanchar Nigam Limited |
| Forest land | 5.2 acres (2.1 ha) |
| Project cost | ₹38 lakh |
| Village / locality | Ahmadpur |
| Taluk / tehsil | Guna |
| District | Guna |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-12228 |
In context
18 applications in Guna since January 2022 are in the same category (Roads & highways): 4 approved, 4 filed or under review, and 10 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ahmadpur, Guna, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gopi Krishna Mvs — lapsed, 3.6 km away
- Mawan Murrum Quarry — more information requested, 4 km away
- Mavan Murrum Quarry — environmental approval granted, 4.3 km away
- Maruti Showroom to Toll Tax Bypass Road Fourlan Chodikaran & Realignment — more information requested, 5.4 km away
- Proposed Standalone Grinding Unit with Cement Production Capacity of 4 Million… — environmental approval granted, 6.1 km away
- Proposed Standalone Grinding Unit with Cement Production Capacity of 4 Million… — cleared for impact study, 6.1 km away
- Mohanpurkalan Stone Quarry — environmental approval granted, 6.2 km away
- Mohanpurkalan Stone Quarry — cleared for impact study, 6.2 km away
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.