Project details
| Status | Initial checks |
|---|---|
| Status since | 25 Nov 2026 |
| Application filed | 25 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pavan Singh Rathor |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Sabalgarh |
| Taluk / tehsil | Sabalgarh |
| District | Morena |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-12265 |
In context
168 applications in Morena since January 2022 are in the same category (Mining): 94 approved, 43 filed or under review, and 31 withdrawn, lapsed or rejected. The approved ones took a median of 16 days from filing to approval. At 2.5 acres, this one is smaller than 99% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Sabalgarh, Morena, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- RDSS 33KV Interconnection lines — lapsed, 1.4 km away
- SABALGARH STONE MINE PROJECT located at KHASRA NO.: 984, VILLAGE- SABALGARH,… — cleared for impact study, 1.9 km away
- SABALGARH STONE QUARRY, AREA – 2.180 Ha, KHASRA NO. 984, VILLAGE- SABALGARH,… — lapsed, 1.9 km away
- Sabalgarh Khanda Patthar/Dhoka Mine — cleared for impact study, 2 km away
- Kutaghan Murrum Quarry — environmental approval granted, 2.3 km away
- Mangrol Stone Quarry — initial checks, 2.4 km away
- Mangrol Stone Quarry — cleared for impact study, 2.4 km away
- Kajona Soil & Clay Quarry — environmental approval granted, 2.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.