One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project for Manufacturing of Active Pharmaceutical Ingredients (APIs), API…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 16 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Gufic Biosciences Limited |
| Land area | 14.8 acres (6 ha) |
| Project cost | ₹102 crore |
| Village / locality | Mohna |
| Taluk / tehsil | Depalpur |
| District | Indore |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-12278 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Nov 2026 (this page) | Under environmental review | 14.8 acres | ₹102 crore |
| Early planning filed 28 Feb 2026 | Cleared for impact study | 14.8 acres | ₹102 crore |
In context
8 applications in Indore since January 2022 are in the same category (Industry): 3 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mohna, Depalpur, Indore, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project for Manufacturing of Active Pharmaceutical Ingredients… — cleared for impact study, 0 m away
- Mohna Murrum Quarry — environmental approval granted, 1.2 km away
- Machal Stone & Murram Quarry — lapsed, 1.8 km away
- Bejipur Crusher Stone Deposit — not approved, 2.6 km away
- Warehouse project "Kamakhya Industrial & Logistics Parks Private Limited" — environmental approval granted, 4.5 km away
- Smart Industrial Township Pithampur Sector-07(Investment Region Development… — cleared for impact study, 4.6 km away
- Industrial Park with Logistic Hub at MPIDC Sector 7 — lapsed, 4.6 km away
- Proposed Greenfield Plant of Integrated paint manufacturing and Synthetic… — under environmental review, 4.7 km away
All 3 Gufic Biosciences projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.