What is Developing? Open the mapMap

Forest land use approvedRoads & highways · Cachar, Mizoram

Four-Laning of Vairengte-N. Chhimluang Section (Pkg-3) of NH 306 From Existing Chainage Km 43+000 to Km 59+700 (Design Ch Km 46+000 to Km 60+850) on Vairengte- Sairang Road in the State of Mizoram Under Bharatmala Pariyojna on Epc Mode.

Four-Laning of Vairengte-N. Chhimluang Section (Pkg-3) of NH 306 From Existing Chainage Km 43+000 to Km 59+700 (Design Ch Km 46+000 to Km 60+850) on Vairengte- Sairang Road in the State of Mizoram Under Bharatmala Pariyojna on Epc Mode is an approved road project in Bar>K Reserved Forest, Udarbond, Cachar, Mizoram. The site covers 223.2 acres. Its stated project cost is ₹287 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 13 Aug 2025).

See it on the live map All projects in Cachar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusForest land use approved
Status since13 Aug 2025
Application filed26 Nov 2024
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantNhidcl
Land area223.2 acres (90.3 ha)
Forest land200.2 acres (81 ha)
Project cost₹287 crore
Village / localityBar>K Reserved Forest
Taluk / tehsilUdarbond
DistrictCachar
StateMizoram
Location fromSite boundary on record
Our referenceWID-MZ-00020

In context

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bar>K Reserved Forest, Udarbond, Cachar, Mizoram. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Nhidcl in Cachar

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.