Quick answers
What is Construction of Pukzing to Silsury Road (Intermediate Lane)?
Construction of Pukzing to Silsury Road (Intermediate Lane) is an approved road project in Silsuri, West Phaileng, Mamit, Mizoram. The site covers 124.5 acres.
Who is building it?
The applicant is Construction of Pukzing to Silsury Road (Intermediate Lane).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 17 Apr 2026), as of 27 Nov 2026.
Where is it?
In Silsuri, West Phaileng, Mamit, Mizoram.
How big is it?
It has a stated cost of ₹109 crore; a site of 124.5 acres and 6.5 acres (2.6 ha) of forest land.
When was it filed?
The application was filed on 1 Aug 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 17 Apr 2026 |
| Application filed | 1 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Construction of Pukzing to Silsury Road (Intermediate Lane) |
| Land area | 124.5 acres (50.4 ha) |
| Forest land | 6.5 acres (2.6 ha) |
| Project cost | ₹109 crore |
| Village / locality | Silsuri |
| Taluk / tehsil | West Phaileng |
| District | Mamit |
| State | Mizoram |
| Location from | Site boundary on record |
| Our reference | WID-MZ-00053 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Aug 2024 (this page) | Forest land use approved | 124.5 acres | ₹109 crore |
| New project filed 30 Jul 2024 | More information requested | ₹109 crore |
In context
14 applications in Mamit since January 2022 are in the same category (Roads & highways): 1 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. At 124.5 acres, this one is larger than 85% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Silsuri, West Phaileng, Mamit, Mizoram. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Pukzing to Silsury road (Intermidiate lane) — decision issued, 50 m away
- Construction Work of 02 Bops — lapsed, 2.6 km away
- Construction of Pukzing to Silsury Road (Intermediate Lane) — more information requested, 2.6 km away
- Construction of Bop — more information requested, 2.6 km away
- FOREST AND WILDLIFE CLEARACNE FOR 03 BOPs INSIDE THE DTRF — lapsed, 34.2 km away
- Dampoli Maj Pmt Bridge at Km 121.730 — application filed, 36.9 km away
- Construction of Muallungthu to Lungphun Road — initial checks, 37.1 km away
- Dampa Rengpui Maj Pmt Bridge — decision issued, 37.2 km away
More from Construction of Pukzing to Silsury Road (Intermediate Lane) in Mamit
- Construction of Pukzing to Silsury road (Intermidiate lane) — decision issued
All 3 Construction of Pukzing to Silsury Road (Intermediate Lane) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.