Project details
| Status | More information requested |
|---|---|
| Status since | 23 Sept 2026 |
| Application filed | 9 Jul 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Ankit Tussia |
| Land area | 7.7 acres (3.1 ha) |
| Forest land | 7.7 acres (3.1 ha) |
| Project cost | ₹26.7 crore |
| Village / locality | Bawnga Veng |
| Taluk / tehsil | 'N' Thingdawl |
| District | Kolasib |
| State | Mizoram |
| Location from | Site area on record |
| Our reference | WID-MZ-00090 |
Where it is
Bawnga Veng, 'N' Thingdawl, Kolasib, Mizoram. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4-Laning of Khamrang-Mualkhang-Sairang section (Package-7&8, Design Chainage… — lapsed, 5.2 km away
- 4 - laning of N. Kawnpui – West Serawlg - Sairang section (Package-7 &… — forest land use approved, 6.5 km away
- Construction of Road from Khamrang to Selesih — lapsed, 7 km away
- Lpg Bottling Plant — forest land use approved, 11.6 km away
- Lpg Bottling Plant — lapsed, 11.6 km away
- 4-Laning of N.Kawnpui-Mualkhang section (Package-7, Design Chainage 111+850 to… — lapsed, 14.6 km away
- Four Laning of Sethawn -N Kawnpui Section (Package -6) of NH-6 From Existing… — lapsed, 18.9 km away
- Four Laning of Sethawn -N Kawnpui Section (Package -6) of NH-6 From Existing… — forest land use approved, 25.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.