Greenfield Project of Grain Based Distillery Plant of 200 KLD by M/s SAO Breweries and Distilleries Private Limited is an approved industrial project in Talajaring, Junagarh, Kalahandi, Odisha. The site covers 40 acres.
Who is building it?
The applicant is Sao Breweries and Distilleries Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Oct 2022), as of 27 Nov 2026.
Where is it?
In Talajaring, Junagarh, Kalahandi, Odisha.
How big is it?
It has a stated cost of ₹250 crore and a site of 40 acres.
When was it filed?
The application was filed on 3 Oct 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Project of Grain Based Distillery Plant of 200 KLD by M/s Sao Breweries and…
Project details
| Official title | Greenfield Project of Grain Based Distillery Plant of 200 KLD along with Co-Generation Power Plant of 6 MW at Village- Talajaring, Tehsil- Junagarh, District- Kalahandi, State- Odisha by M/s SAO Breweries and Distilleries Private Limited. |
|---|---|
| Status | Environmental approval granted |
| Status since | 3 Oct 2022 |
| Application filed | 3 Oct 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Sao Breweries and Distilleries Private Limited |
| Land area | 40 acres (16.2 ha) |
| Project cost | ₹250 crore |
| Village / locality | Talajaring |
| Taluk / tehsil | Junagarh |
| District | Kalahandi |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00102 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Mar 2023 | Environmental approval granted | 30 acres | ₹250 crore |
| New project filed 3 Oct 2022 (this page) | Environmental approval granted | 40 acres | ₹250 crore |
In context
11 applications in Kalahandi since January 2022 are in the same category (Industry): 9 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 40 acres, this one is larger than 73% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Talajaring, Junagarh, Kalahandi, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Project of Grain Based Distillery Plant of 200 KLD by M/s Sao… — environmental approval granted, 50 m away
- Transfer of Environmental Clearance of Bileikuni Stone Quarry Over an Area of… — environmental approval granted, 9.8 km away
- Approval of District Survey Report of Kalahandi District for Sand — environmental approval granted, 10.9 km away
- Approval of District Survey Report o Kalahandi District for Stone — environmental approval granted, 10.9 km away
- Approval of District Survey Report of Kalahandi District for Morrum — environmental approval granted, 10.9 km away
- District Survey Report (DSR) of Kalahandi District for Sand, Stone, Morrum,… — returned to applicant, 10.9 km away
- Amendment of Environmental Clearance of Atigaon Sand Bed over an Area of… — not approved, 11.5 km away
- Amendment of Environmental Clearance of Atigaon Sand Bed over an Area of… — not approved, 11.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.